Cointime update: The Institute of Engineering Thermophysics under the Chinese Academy of Sciences and Zhongchu Guoneng (Beijing) Technology have completed integration testing of a 600MW-class compressed air energy storage expander, the first of its kind internationally, and the unit has rolled off the production line. All test results met or exceeded design targets, with 100% domestically sourced equipment. Compared with 300MW-class systems, the 600MW system doubles scale, cuts unit power cost by 20% to 30% and raises system efficiency by 3% to 5%.
China’s First 600MW Compressed Air Energy Storage Expander Rolls Off Line
Share on WeChat
Open WeChat → Scan → then tap "…" to send to a chat or Moments.
Tap "…" in the top-right corner to send to a chat or share to Moments.
Related News
26m ago
Asia Stocks Slide; A-Shares Down Over 1%, Taiwan Plunges 8%
26m ago
Key Events to Watch: ECB Minutes, US Q3 GDP Revision, Fed Beige Book
29m ago
Xinjiang Issues Multi-Tranche Local Government Bonds, 5-Year General Bond at 1.33%
30m ago
Japan 40-Year JGB Auction Sees Weak Demand on Fiscal Uncertainty
31m ago
Lenovo shares fall over 8% after Morgan Stanley cuts target price by 39%
34m ago
Japan 10-year government bond yield falls 5.5 bps to 2.665%