Cointime update: Construction began on Nov. 25 on the diversion tunnel for the 2.6-million-kilowatt Benzilan hydropower project on the upper Jinsha River, moving the site into full-scale construction. The project is the largest hydropower station by installed capacity on the upper Jinsha River. No timeline or cost figures were disclosed.
China Starts Diversion Tunnel at 2.6GW Benzilan Hydropower Project on Jinsha River
Share on WeChat
Open WeChat → Scan → then tap "…" to send to a chat or Moments.
Tap "…" in the top-right corner to send to a chat or share to Moments.
Related News
12m ago
China Exim Bank Issues Over 700B Yuan in Tech Loans in First 10 Months
16m ago
Jilin Issues 10-Year and 30-Year Local Government Bonds
23m ago
Philippines VP Sara Duterte Says She Will Never Resign Amid Impeachment
23m ago
Nvidia B300 GPUs pile up for sale after new US export rule; Hong Kong stocks rebound 1.19%
26m ago
China’s CCPIT Rejects U.S. Section 301 Tariffs Over ‘Structural Overcapacity’
29m ago
Meituan Q3 Revenue Beats Estimates at RMB115.56B